Product Description
Turntable bearing
Only professionals are allowed to transport.
Transportation of packages.
Packages that are not fixed on the shelf can be transported by forklift or fork under the following conditions.
Type lifting car for transportation:
Forklift or fork lift truck shall be able to bear the weight of transport parts.
Forklift drivers should be qualified to drive.
swing
... an extension of sufficient length and width is placed between the bracket and the package.
(such as wood or metal parts) to ensure that the weight is distributed to the outer diameter of the part.
bracket
(with possible extension) After insertion, ensure that the other end protrudes upward.
Up.
Ensure that the package will not tip over when the upper part is overweight.
Raise the package.
And began to transport.
Transport shelves by crane.
Illustration 2 Transport by crane.
Packages packed on the shelves or in containers can pass through under the following conditions.
Heavy machine for transportation:
Cranes and lifts should be able to bear the weight of packages.
Operators shall be qualified to operate cranes.
swing
. according to
Illustration 2. Hang ropes, belts or multi-point hooks on the shelves/containers.
Check whether the sling will damage the package.
. Use other slings when necessary.
. Start transporting the slewing connection of wind power generation equipment.
transport
Packaging and storage.
Packaging and storage.
Illustration 3 Transport by forklift.
Packages packed on shelves or containers can pass through under the following conditions.
Forklift transportation:
The forklift should be able to bear the weight of the transported parts.
Forklift drivers should be qualified to drive.
. drive the forklift with fork into the shelf.
Between or under the crossbars of the container. After entering the fork, make sure that the other end of the fork protrudes upward.
It shall be ensured that the shelf/container will not tip over when the center of gravity deviates.
Elevated package.
And began to transport.
Upon receipt of the goods, they shall be inspected for completeness and damage caused during transportation.
In case of obvious external damage during transportation, the following methods can be adopted:
Should refuse to accept the goods or accept them conditionally.
Indicate the damage scope on the transportation materials or the carrier's bill of lading.
Enter the claim procedure.
If the goods are defective, they shall be notified within 2 days after delivery. The right to claim compensation is only claimed here.
Effective within the compensation period.
About packaging
Individual packages shall be packed according to the transportation conditions. Some packaged parts need to be matched.
After packaging with VCI thin film, fix it on the shelf, in the container or on the transport rack and send it out in an inclined way. Packaging of individual components shall ensure that the components avoid damage, corrosion and other forms of damage during transportation before installation. Therefore, the package must not be damaged, and it should only be removed during installation. Parts transported by transport racks shall be stored flat. Transportation should be removed at the time of installation.
Rack. If the parts are not covered outside the specified storage time, the operator must do so.
Keep it properly.
If no agreement is reached, it is assumed that the part has been used within 8 weeks.
Illustration 6: VCI film.
Illustration 7: Transport rack.
Treatment of packaging materials.
If the packing material is not considered.
Material processing to reach a separate agreement, according to the type and size of the material points.
Open, for reuse or recycling.
pay attention to
Packaging materials should be handled in an environmentally friendly way.
. Improper cleaning may lead to improper cleaning may lead to.